2022/08/08Overseas Projects
Project for the enhancement of the electric power grid system in Haiti
In 2020, TEMES,Subcontractor, and OIDC (Overseas Investment & Development Corp.), Main contractor, undertakes the project for the enhancement of the electric power grid system in Haiti. TEMES is to provide consulting service and design works. Erection/rehabilitation of Substations and transmission line.
View more -
2022/08/08Overseas Projects
Eswatini Project
Solar PV training, Solar PV Assessment of a solar PV interconnected to national grid system in Eswatini, Solar PV Design Review and Supervision, Coal fired power plant feasibility study, Distribution network improvement survey report
View more -
2022/08/08Overseas Projects
Guam CT PMC project
Performance Management Contract for Combustion Turbine (CT) of Dededo, Macheche and Yigo Power Plants in Guam, U.S.A.
View more -
2022/08/08Overseas Projects
Performance Management Contract for Units No. 1 & No. 2 Steam Turbine Generator of Cabras Power Plant in Guam, U.S.A.
Performance Management Contract for Units No. 1 & No. 2 Steam Turbine Generator of Cabras Power Plant in Guam, U.S.A.
View more
On December 30, 2002, TEMES, Inc. and Guam Power Authority (GPA) entered into the Performance Management Contract (PMC) for Units No. 1 & No.2 66MW steam turbine generator. Up to now since 2003, the project has greatly improved the performance of the power plant and thence TEMES, Inc. won the recognition from GPA. -
2022/08/08Overseas Projects
BOT Contract of the 40MW Combustion Turbine Generator Unit of Piti Power Plant in Guam, U.S.A.
This project is the first Independent Power Plant (IPP) invested by TEMES, Inc.. After the Plant successfully connected to the grid, TEMES, Inc. has been in charge of the management, operation and maintenance of the Plant for the 20 years afterward. After the expiration of the contract the whole project will be transferred to Guan Power Authority. This project was awarded to TEMES, Inc. through an open tender in September, 1996 by Guam Power Authority (GPA). The unit has been put into commercial operation since December 1997, and greatly helped GPA to overcome the shortage of electricity in Guam.
View more -
2022/08/08Overseas Projects
Performance Management Contract (PMC) of Santo Amaro New Power Plant for EMAE Power Company, the Democratic Republic of Sao Tome and Principe
In 2010 TEMES, Inc. and EMAE Power Company entered into Performance Management Contract (PMC) of 5 x 1701KW container-type diesel generator units.
View more -
2022/08/08Overseas Projects
El salvador and Hnduras - feasibility study
Feasibility Study for 160km of 230kV Transmission Line Connection and Auxiliaries between Honduras and El Salvador
View more -
2022/08/08Overseas Projects
Srisailam Hydropower Project, India
Power Plant Layout for 6 Generator Sets and Design of Instrument and Control.
View more -
2022/08/08Overseas Projects
Pulau Seraya Thermal Power Plant Project, Singapore
•The Erection of 3 x 250MW Seam Turbine Generators, 2 x 25MW Gas Turbine Generators and Auxiliary Equipment, Entrusted by NEI Parsons.
View more
•The Erection of General Piping and Instrument and Electrical Work for 3 x 795 ton/hr Reheat Steam Boilers and Auxiliary Equipment, Entrusted by Mitsui Engineering and Shipping Co. (MES). -
2022/08/08Overseas Projects
Morupule Thermal Power Plant Project, Botswana, Africa
The Erection of 3 x 33MW Steam Turbine Generators and Auxiliary Equipment, Entrusted by NEI Parsons
View more -
2022/08/08Overseas Projects
Electrification Project, Saudi Arabia
The first and the largest project TEMES, Inc. has ever implemented was the construction work of Al-Baha Electrification Project of Saudi Arabia. This project covered a service from design, construction and commission, to a period of 7 years of operation & maintenance (O&M) services of a power system. The construction was implemented over a period of 9 years, from July 1977 to August 1986. The total project cost included the construction cost and the O&M fee was more than US dollars two hundred million (USD 200,000,000). There were up to 1300 employees of TEMES, Inc. stationed at site during the peak period of the construction.
View more -
2022/08/08Overseas Projects
Electrification Project, Saudi Arabia
˙Najran Electrification Project
View more
(1)5 × 24MW and 5 × 23685kW Gas Turbine Generator Units
(2)164km of 132kV Double-Circuit Transmission Lines and 143km of 33kV Single-Circuit Transmission Lines.
˙Jizan Electrification Project
(1)6 × 7MW Diesel Generator Units and 2 × 15MW Gas Turbine Generator Units
(2)4 x 33/13.8kV Substations and 4 x 132/13.8kV Substations
˙Al-Baha Electrification Project
(1)2 × 5MW and 5 × 10MW Diesel Generator Units
(2)60km of 132kV Double-Circuit Transmission Lines and 150km of 33kV Single-Circuit Transmission Lines.
(3)9 x 33/13.8kV Substations